Zary WF (OE-B)

Case Study

  • Leading technical/support commercial negotiations for BOP Contracts
  • Support for TSA and GCA contracts negotiations
  • Support in with finetuning financial models inputs
  • Support Client in complying with all local statutory requirements e.g. Permits, Licenses, HSSE
  • Technical lead for Lenders Technical Due Diligence responses
  • Finance Close support
Green Power
TOTAL Logo

Related Case Studies

Location
Poland
Lubanice, Drozkow
Client
OX2 Construction AB
Technology
Onshore Wind
Manufacturer
Nordex
Rated Power
21 MW
WTG
7
  • Leading technical/support commercial negotiations for BOP Contracts
  • Support for TSA and GCA contracts negotiations
  • Support in with finetuning financial models inputs
  • Support Client in complying with all local statutory requirements e.g. Permits, Licenses, HSSE
  • Technical lead for Lenders Technical Due Diligence responses
  • Finance Close support
OX2
Nordex Logo
Location
France
various locations
Client
Ventelys
Technology
Onshore Wind
Manufacturer
N/A
Rated Power
234 MW
WTG
126

Services

  • Preliminary design of roads and platforms
  • WTG logistics feasibility study
  • Technical assistance for the organization of the project
  • Platform, layout and land lease optimizations
  • Review of Roads and Platforms conditions and identify improvements

Challenges

  • Different costs and solutions for roads and hardstands required
Location
Thailand
Nakhon Ratchasima
Client
Wind Energy Holdings
Technology
Onshore Wind
Manufacturer
Vestas
Rated Power
180 MW
WTG
15

Services

  • Foundation Design
  • Foundation Construction Supervision
  • Method Statement and Quality Documentation implementation

Challenges

  • Size and structure of the project, Language, Culture, Standards
  • Drafting & obtaining approval from DNV of Quality Management Plan
  • Simultaneous to construction works monitoring
Location
Ireland
Garvaghy, Co. Tyrone
Client
Brookfield Renewable
Technology
Onshore Wind
Manufacturer
N/A
Rated Power
14 MW
WTG
7

Services

  • Design Review CAT III (FDN)
  • Construction Checks
  • Due Diligence Reporting
  • Executed Construction QA
Location
Poland
Elbląg
Client
EDP Renewables
Technology
Onshore Wind
Manufacturer
Vestas
Rated Power
35 MW
WTG
10

Construction Preparation

  • Submissions Review – Designs, Quality Plans, Materials

Construction Supervision

  • Coordination/ Quality/ Time/Cost/Stakeholder management
  • Contract administration support
  • BOP, WTG and H&S Supervision

Handover Management

  • Punchlists/ Permit of Use/ Grid Licensing Coordination
Location
Brazil
Guanambí, Bahía
Client
Brookfield Brazil
Technology
Onshore Wind
Manufacturer
N/A
Rated Power
254 MW
WTG
184
  • Foundation Design Review, Construction Data Review
  • Data Mining, Analysis, Selection of foundations for on-site inspections
  • Inspection of substation, transformers and ducts
  • Foundations Rebar Scanning Test, Rebound Hammer, UPT Test and Carbonation Test
  • Review of Roads and Platforms conditions and identify improvements
  • Reporting Desk Study findings, Site inspection checks, evaluation matrix